Description

The Borough Council of Bolton ("the Client") is prepared to receive tenders for TC005 - Highways Construction Framework 2024 - 2028 which will be subject to the information, specification and tender package enclosed Lot 1- General Civil Engineering Works up to £2.0m, including • Minor Highway Improvements • Ducting Works • Drainage Works Undertake works included in the programme of Road Safety, junction improvement, Traffic Calming and other minor schemes. Undertake drainage works, including flood prevention works. Undertake civil and ducting works to existing and proposed traffic signal installations throughout Greater Manchester. Typical scheme value - £250,000 to £1,000,000. It is not possible to indicate how many, if any, schemes will be carried out each year. Lot 2 Patching, Re-Surfacing and Surface Treatment Works up to £2.0m Undertake Structural Maintenance programmes for classified and unclassified road carriageway and footway schemes. Typical scheme values have ranged between £30,000 and £600,000 with around £3M being spent each year. Lot 3 Highway New Works, Structural Maintenance and Associated Works up to £5.0m Undertake works included in the Principal Road Major Maintenance Programme. Undertake new highway works. Typical schemes have averaged £1,500,000 in value in recent years with around four schemes being carried out each year. Lot 4 Bridges and Highway Structures Improvement and Maintenance Works up to £3.0m Undertake bridgeworks and highway structures works programme. Average scheme value is £125,000 with 2 or 3 schemes being carried out each year.

Related organisations

Classifications

Common Procurement Vocabulary codes attached to this contract.

  • 45000000
    Construction work